Abstract The present invention relates to a foundation comprising one or more layers or mattresses of tyres (12 and 14), and a fill material provided within and/or between tyres of each of the mattresses (12 and 14). The fill material (16) is preferably a relatively coarse aggregate and provides a porous bed having relatively high drainage capacity. The lowermost mattress (14) is typically wrapped in a porous sheet such as a geofabric cloth which is designed to allow the passage of water across the lowermost mattress (14) whilst preventing the ingress of relatively finer material into the fill and which can otherwise lead to degeneration of the foundation. At least some of the tyres typically also have an upper sidewall removed therefrom.
Full Text Field of the Invention
The present invention relates to a foundation formed from one or more layers of tyres. When the term "foundation" is used'herein, it includes any weight bearing surface such as a roadway, building foundation, railway track base, etc and any causeway including drainage floors, flow channels, drainage pit base, water sump, trickle filter base, bank way (including wave mat banks in water break walls) etc. The term "foundation" is not intended to include retaining walls or the like (which are covered in the applicant's'co-pending application WO 98/49400), although various of those retaining walls are disclosed herein.
Background Art
The use of tyres (especially used tyres) in retaining walls and retaining slopes is known. AU 10006/95 suggests a use for old tyres by providing a trench formed to accommodate the tyres in a side by side position to form a drain, tunnel, duct, ventilation shaft or the like.
FR 2643400 discloses a surface stabiliser formed from tyres set in straight lines and forming squares, with one tyre at each corner of a square. Alternatively, the tyres can be provided in staggered rows with adjacent tyres forming triangles. The tyres are bound together using natural synthetic fibres and can be filled with pieces of rock and covered, after laying, with rock or stones and a layer of soil to receive plants etc. However, FR 2643400 only discloses a single row of tyres, and does not disclose any structures which would be suitable for use in high load or highly erosive environments.
Similarly, RU 2060610 discloses a terracing arrangement employing used tyres in a staggered arrangement (Figure 2 therein). Again, the arrangement disclosed in this document is not suitable for use in high load or . highly erosive environments, but is concerned with
providing a simple- mat-type structure"1 to prevent land erosion from rain.
NL "7706564 discloses a mattress for reinforcing an underwater structure. A plastic fabric has tyres secured thereto and a weighting material (a coarse rock) is positioned in those tyres. In such an arrangement, the ccarse material is highly susceptible to ingress of fines material and thus breakdown. In addition, the tyres are simply provided to carry the weighting material so as to hold the plastics underlay in position. The arrangement is not concerned with load, bearing applications.
SU 1312130 discloses a slope covering formed from old car tyres. The structure includes a protective earth layer reinforced with used tyres over which a stone material reinforcement layer, also reinforced with used tyres, is laid. Junction elements are provided between the tyre layers to join the two together. In addition, a polymer screen to prevent the earth layer from being leached from the structure is provided, but again there is nothing to suggest any substantial anti-erosive performance or load bearing capacity.
RU 2043-555 discloses a road bed construction method which involves forming a mat of tyres which are secured in the lengthwise direction. The tyres are connected at their treads, are then covered with earth, peat or sand and are then covered with a geotextile layer. However, the construction does not prevent the ingress of fine materials into the mat, and thus would deteriorate over time.
Summary of the Invention
In a first aspect the present invention provides a foundation comprising one or more layers of tyres including a lowermost layer being located adjacent to the ground, and a fill material provided within tyres of each of the layers, wherein at least the lowermost layer has a porous sheet positioned thereunder which is adapted for allowing the passage of water across the lowermost layer whilst
Foundations constructed in accordance with the present invention can be suitably employed on: roads; ground or sub base such as sand and wetlands; drainage ways, courses and channels; railway track bases; mining tunnels; ramps and slopes adjacent to lakes, rivers, creeks, oceans; wave dissipation and breakwater walls; waste cell pits; stockpile bases, pavements; silt traps etc. All such environments are susceptible to erosion and deterioration through water saturation, and previous barriers employed
In the foundation and the method of constructing the same, it is preferred that the tyres within each of the layers are laid generally horizontally and-are located adjacent to one another in a fixed array, each of the layers in conjunction with the fill material forming a tyre mattress. Such a "mattress" construction provides a very stable foundation base and tends to resist erosion and provide high load bearing capacity.
In the foundation, or method of constructing the same, at least two layers of tyres can be provided, and preferably each tyre in each layer has a sidewall removed therefrom so that the tyres can be oriented to be generally upwardly open in use to receive the fill material therein. When each tyre is open (having its uppermost sidewall removed therefrom) fill can be readily compacted in each tyre and an extremely stable and strong foundation can be constructed.
In the foundation and method of constructing the same, typically the fill material is a rock aggregate or cobble of a relatively coarse grade. Such fill can be susceptible to dislocation and movement in use if finer material (such as sand) penetrates into the foundation structure. This is because the fine material "lubricates" the rock and reduces the interlock between aggregate pieces. Hence the foundation in accordance with the invention is provided.
The number of Jayers employed in the foundation typically depends on the anticipated loadings and required stability of the foundation (eg when it is employed as an underlying road, ground or sub-base).
Typically, the lowermost layer is laid on the ground with minimal earthworks or sub-grade excavation being required. Advantageously, the foundation requires relatively low sub-grade stability and is thus suitable in marsh or swamp land and other wet areas. The layers of tyres or tyre mattresses can also be offset with respect to adjacent layers to prov-ide distribution of the load between adjacent tyres whilst reducing the stability (bearing pressure capacity) requirements of the underlying ground or sub-base (eg. one tyre in one layer can overlay up to four tyres in an underlying adjacent layer).
Preferably, the fill material is a rock aggregate or cobble of a relatively coarse grade. In one example, the rock aggregate fill is of a nominal 75mm diameter. The relatively coarse fill material provides a porous layer having high drainage capacity. The relatively coarse fill material also combines with the tyres to minimise degeneration of the roadway or the drainage floor. The performance of the coarse grade fill can deteriorate if fine material ingresses into the foundation, hence the employment of the porous sheets. Dislocation and movement of the rock aggregate can lead to potholes in gravel roadways etc. Thus typically, the lowermost layer or tyre mattress is wrapped in the porous sheet. In one example, the porous sheet is a porous cloth such as a geofabric cloth which also serves as a fire retardant.
When the foundation is used in a roadway or similar it can further comprise an edge support structure being configured to locate on opposing sides of at least an uppermost layer of the layers of tyres, the support
>
structure acting so as to inhibit movement of the tyres and degeneration of the foundation. In one embodiment the edge
support structure includes a row of support lyres beany located alongside and coupled via a link structure to at least one side of eg. the uppermost layer of tyres.
Typically, the link structure includes a series of lateral tie elements'each linking one of the support tyres to an adjacent tyre of the uppermost layer, and a longitudinal link element interconnecting the tie elements. In one example, the lateral tie elements and longitudinal link elements are constructed of tyre tread connected end to end or alternatively of conveyor belt material. However, other alternatives are also possible (detailed below) .
The foundation can also comprise a series of drainage tyres located adjacent to one another within a trench excavated underneath the lowermost layer of tyres, and a drainage fill material can be provided within or between the drainage tyres. One or more drainage channels can extend from the trench so as to drain water away from the roadway or the drainage floor.
Typically the tyres employed as the basic constructional element have intact tread portions (i.e. a whole tyre is typically used, except that it may have an upper side wall removed therefrom. However, in some applications such as in drainage channels, silt traps etc, part tyres may be employed. For example, half a tyre, still having an upper side wall removed therefrom can be employed, and various other tyre segments can be employed.
In addition, tyres within the foundation can be further strengthened by arranging tyre portions therewithin as additional reinforcement. For example, in addition to fill material, a tyre with an upper sidewall removed therefrom can have one or more coiled tyre treads arranged therewithin, or a stack of tyre sidewalls arranged therewithin, or combinations thereof etc.
Silt trap foundations in accordance with the present invention can be formed by arranging a single lengthwise
row of tyres, and by wrapping the row with lengths of lyre treads or conveyor belts to form an integrated and portable unit. Preferably such units have three tyres arranged end to end, each with an upper sidewall removed therefrom, and with tyre tread lengths extending right around and joined to the tyres.
Brief Description of the Drawings
In order to achieve a better understanding of the nature of the present invention several preferred embodiments of different foundation structures in accordance with the indention will now be described, together with construction methods therefor, by way of example only, with reference to the accompanying drawings in which:
Figure 1 is a sectional view of a roadway according to one embodiment of the invention;
Figure 2 is a schematic sectional view of another embodiment of a roadway of the invention;
Figure 3 shows a plan view and a schematic sectional view of an edge support structure for use with the roadway of Figure 1;
Figure 4 shows a plan view and a schematic sectional view of an alternative edge support structure;
Figure 5 is a sectional view of one embodiment of a drainage floor of the invention;
Figure 6 is a sectional and enlarged sectional view of another embodiment of a drainage floor of the invention;
Figure 7 is a plan view of part of the drainage floor of Figure 6;
Figures 8 and 9, show respectively, plan and sectional side elevations (taken on the line 9-9 of Figure 8) of a double layer tyre reinforced pavement;
Figures 10 and 11 show views similar to those of Figures 8 and 9, but where the double layers form the sub-base of a stockpile pavement;
Figure- 12 L' shows a sectional elevation through a f ] ov; channel, being similar to the drainage floor shown in Figures 5 and 6;
Figures 13 and 14 show, respectively, end and side sectional elevations' through a flow channel incorporating a weir and silt barrier therein, with Figure 14 showing a view taken on the line 14-14 of Figure 13;
Figures 15 and 16 show in side elevation, alternative bank protection foundations (wave mats), with Figure 15 showing an aquaculture pond configuration and Figure 16 a wave mat at a retainin-g wall (such as a seawall) ; Figure 17 shows a sectional elevation' of an alternative wave mat arrangement for use with a retaining wall;
Figures 18, 19 and 20 show side, partial plan and sectional side elevations, respectively, (Figure 19 taken on the line 19-19 of Figure 18) of a trickle filter foundation for a stockpile of material or the like;
Figures 21 and 22 show similar views to Figures 18 and 19, but with a different tyre arrangement;
Figure 23 to 21 show various views of a waste disposal foundation in accordance with the invention wherein
• Figure 23 shows a plan view of one cell of the
waste disposal foundation;
• Figure 24 shows a schematic plan detail of the cell
showing an arrangement of tyres therein;
• Figure 25 shows a cross sectional side view through
the cell of Figure 23;
• Figure 26 shows a side elevation of part of the
distribution channel shown in Figure, 24;
• Figure 27 shows a side cross-sectional view taken
on the line 27-27 of Figure 26;
Figure 28 shows a plan view of a tyre with a side wall removed therefrom;
Figure 29 shows, schematically, a side perspective view illustrating the removal of a tyre sidewall;
Figure 30 shows a plan view of an alternative means for "removing" a side wall of the tyre (by splitting the tyre horizontally through its tread);
Figures 31 to 36 show plan elevations of various ways of arranging and binding the tyres in mattress formations within various foundations in accordance with the present invention; and
Figures 37 to 42 show alternative edge support structures for use with a roadway or other foundation, being alternatives to those structures shown in Figures 3 and 4;
Figure 43 shows a side elevation of a-causeway structure foundation, with Figure 44 showing the same elevation in cross section, and Figure 45 showing a cross section through part of the causeway, illustrating a drainage configuration;
Figure 46 shows in side elevation an alternative roadway and drainage foundation structure, and Figures 47 and 47A show respectively a detail and plan view of the arrangement of Figure 46;
Figure 48 shows a plan view of a tyre for use in a foundation and that has been reinforced internally in accordance with the present invention; and Figure 49 shows a sectional view through the tyre of Figure 48 taken on the line 49-49;
Figure 50 shows a plan view of a roadway constructed using tyres according to Figure 48, and Figures 51 and 52 show sectional elevations through the roadway, for two alternative roadway embodiments;
Figure 53 shows an alternative bank protection foundation incorporating tyres in accordance with Figure 48, and Figure 54 shows a side sectional elevation through the bank protection foundation of Figure 53;
Figure 55 shows a plan elevation of a foundation in the form of silt barrier units arranged in a drainage causeway in accordance with the present invention, and
Figures 56 and 57 show, respectively, end and side sectional elevations through the arrangement of Figure bb;
Figure 58 shows an individual silt barrier unit foundation in perspective view and associated with a drain; and Figure 59 shows an alternative silt barrier foundation to that of Figure 58 when located in a V drain configuration.
Modes for Carrying Out the Invention
As shown in Figures 1 and 2 a foundation in the form of a roadway 10 comprises two layers of tyres or tyre mattresses resting upon one another. Each mattress 12, 14 includes an array of tyres such as 12A to -12E and 14A to 14D. Tyres of the upper and lower mattresses 12 and 14 are typically offset relative to each other so as to distribute the load with each of the tyres being laid horizontally. The various offset arrangements that can be adopted can be appreciated by considering, for example Figures 1, 8 and 10. Thus one tyre in one mattress can be supported by up to four tyres in an adjacent underlying mattress. This substantially improves load distribution over previous arrangements.
The upper and lower tyre mattresses 12 and 14 are in-filled with a fill material indicated as 16. The fill material 16 is preferably a rock aggregate or cobble having a nominal 75mm diameter. ' Thus, the relatively coarse fill material 16 forms a porous bed typically both within and between adjacent tyres such as 12A to 12E and 14A to 14D thereby providing a rock aggregate bed with a high drainage and yet a high load capacity. Furthermore, the relatively coarse fill material 16 combines with the tyre mattresses 12, 14 to provide a strong and stable structure, thereby minimising degeneration of the roadway 10.
At least some of the tyres in at least one of the layers have a sidewall removed therefrom (or have an equivalent -structure which is akin to removing a sidewall (see eg the tyre arrangements of Figures 28 to 30) ) .
Typically most or al] of the tyres have a sidewall removed therefrom, and the tyres are positloned in the roadway so that the remaining sidewall faces downwardly (as better shown in eg Figure 9). By removing the tyre sidewall (or providing an equivalent structure) the fill material can be compacted within the tyre (tyres that have both sidewalls inract cannot be filled and compacted to anywhere near the same extent) . Thus, each such tyre functions something like an anchor within the foundation in which it is arranged, and this greatly enhances the strength and stability and minimises., degeneration of the foundation over time.
Typically at least the lower tyre mattress 14 is wrapped in a porous sheet 18 such as a geofabric cloth. The geofabric cloth 18 is designed and selected to allow the passage of water across the lower mattress 14 whilst preventing the ingress of relatively fine material into the gravel bed of the lower mattress 14. If fines "contaminate" the gravel bed 16 this accelerates degeneration of the roadway 10 as evidenced by formation of potholes in conventional gravel roadways. The geofabric cloth 18 in the roadway construction can also serve as a fire retardant. The upper tyre mattress 12 in this embodiment is not covered in a geofabric cloth. Typically the cloth is wrapped right around the mattress with the free ends being lapped over the upward facing mattress surface after wrapping. The next mattress is then layered over those lapped ends to fasten the cloth around the mattress (and so on - as required).
The roadway 10 also includes an edge support structure 20, which is constructed from in-filled tyres. The edge support structure is located on opposing sides of the upper and lower tyre mattresses 12 and 14. The roadways of Figures 1 and 2 incorporate two variations of the support structure 20 each using tyres 22 at least partly buried below ground level G. However, the edge support tyres 22
may also be located within a trench excavated aJongs.oe tne roadway 10. The support structure 20 of Figure 1 includes edge support tyres 22 or.ented in an inclined plane wherea" the support structure 20' of Figure 2 includes a vertically oraented series of tyres 22 forming an outermost boundary to the roadway 10.
3, 4 and 37 to 42 illustrate other forms of edge support structures 26 to those described above. These alternative support structures 26 can comprise a row of support tyres 28 each located alongside and forming a boundary to the sides of the upper and/or lower tyre mattresses 12 or 14 . A link structure shown generally as 30 xncludes one or a series of lateral tie elements 32 having one end connected to a longitudinal link element 34 or fastening arrangement 35 (Figures 37 to 39) both of which in turn connect the tie elements to the tyre rows 28 The tie elements 32 can engage (by being under and/or being fastened to) the upper or lower tyre mattress 12 or 14 to couple the mattress 12 or 14 to the link structures 30. Support structure 26 is effective in inhibiting movement of the tyre mattresses 12 and 14 which might in some circumstances lead to degeneration of the gravel bed 16 and roadway 10.
In the support structure arrangements depicted in Figures 3 and 4, the lateral tie elements 32 each consist of a length of tyre tread or conveyor belt underlying both the boundary tyres of the tyre mattress 12 or 14 and the support tyres 28, and being wrapped around these abutting tyres in a figure of eight arrangement as crudely illustrated by the arrows of Figures 3 and 4. The longitudinal link element 34 consists of another length of tyre tread or conveyor belt having a pair of opposing longitudinal cuts 39(as shown in Figure 41) which together define a slot through which one of the lateral tie elements 32 is passed prior to wrapping of the tie element 32 around the abutting tyres. The lengths of tyre tread are formed
from one or a series of tyro treads or conveyoj belts Domed end to end. The tyre treads can be formed from recycled tyres having both of their sidewalls cut away whereas typically the conveyor belts are unmodified discarded belts. If will be appreciated that the in-fill material, most generally rock aggregate, within the support tyres 28 serves to lock the tie element 32 back onto itself so as to rigidly anchor the support structure adjacent to the upper and/or lower mattresses 12 or 14. The link structure 30 of Figure A can further (or alternatively) include a recycled concrete beam 38' in place of a length of belt or tread.
Referring to Figures 37 to 42, alternative link structures 26 are depicted.
In Figure 37, the fastening arrangement 35 includes a pair of fastening pins 36 for attaching tyre or belt tie elements 32 to each tyre in row 28. Typically the pins are fastened to the tyre lower sidewall and can be, for example, bolts, rivets, metallic ties, etc.
Figure 38 shows an alternative mechanism for attaching tie element 32 to tyre 28. In this case, a clamp 37 is fastened around element 32 and the tyre lower sidewall (as depicted). The tie element can be looped up through the lower opening of the tyre and doubled back, and a clamp can then be clamped around that looped end of the tie element, sandwiching the tyre lower sidewall therebetween. Typically the clamp is preformed from a deformable metallic material which is typically also corrosion resistant.
Figure 39 shows a similar arrangement to Figure 38, but in this case the tie element is looped up through the tyre lower opening and back over the tyre lower sidewall, and then out of the tyre through an appropriate slit preformed in the tread section thereof. The free end of the tie element is then optionally fastened back onto the tie element via a bolt or pin fastening 38.
Figure 40 shows an arrangement somewhat, similar to that shown in Figures 3 and 4, but in this case the free end ol tie element: 32 is passed up and right through the tyre. A pair of longitudinal slits 39 are formed in the free end of tie element 32, and a rod 34 (eg. a corrosion resistant metal rod, a concrete pillar etc) is slotted therethrough. In use the weight of fill material then maintains the rod in position.
Figure 41 shows a similar arrangement to Figure 40, but in this case the rod 34 is replaced by a length of tyre or belt tread 34'.
In Figure 42, it can be seen that each tie element can extend right across the roadway, and under either or both of mattress 12 and mattress 14. This further enhances the structural stability and integrity of the roadway.
Figure 1 also illustrates a drainage system shown generally as 40 which may be used in conjunction with the roadway 10. The drainage system 40 includes a trench 42 pre-excavated under the lower tyre mattress 14, a series of drainage tyres 44 being located adjacent to one another within the trench 42. The trench 42 and tyres 44 are in-filled with the fill material such as 75mm rock aggregate. Alternatively, the trench 42 may include the rock aggregate fill material only without relying on drainage tyres. A number of drainage channels 46 spaced longitudinally along the roadway 10 extend away from the trench 42 so as to drain water within the trench 42 away from the roadway 10. The roadway 10 typically includes a 1% camber or transverse run-off to further assist in water drainage.
In a further embodiment of the invention the foundation can be provided in the form of a drainage floor, shown generally as 50 in Figures 5 to 1. The drainage floor 50 is similar in construction to the roadway 10 described above, being formed as a two layer tyre mattress 52, 54. Mattress 52 however, can continue someway up
sidewalls of a trench or canal 56 in which the floo; :s located (eg. providing sufficient coverage for extra fluid flow therewithin) The drainage floor 50 when located within the trench or canal 56 is thus supported on the boundary walls of the trench or canal and as a result, the drainage floor does not require an edge support structure as incorporated in the roadway 10 described above. Otherwise, the drainage floor 50 is similar to the roadway 10 in its basic construction having the lower mattress 54 wrapped in a porous layer such as geofabric cloth 58. The upper and lower tyre mattresses 52 and 54 are both in-filled with a fill material 60 preferably being a relatively coarse grade rock aggregate.
The drainage floor 50, although primarily designed for water drainage, may also be constructed so that it can function as a roadway. When serving the dual function of a drainage floor and roadway the drainage floor is designed with the necessary number of layers of tyres or tyre mattresses in order to adequately handle anticipated vehicle loadings. This will also be influenced by the inherent ground stability wherein additional tyre mattresses may be used with unstable or saturated ground such as that experienced in marsh and swamp lands, or in high drainage flow areas.
Figures 5 to 7 illustrate two forms of drainage floors 50 and 50' being configured according to the shape of the trench or canal. In both examples, tyres within the upper and lower mattresses 52 and 54 are offset or staggered relative to each other so as to most effectively distribute the load from the upper mattress to the lower mattress (see Figure 7). As illustrated in some detail in Figure 6 outermost, tyres 54' of the lower mattress 54 undercut the existing bank 56 of the trench or canal. This provides additional edge support to the upper and lower mattresses if required.
Referring now to Figures 8 and 9, a tyre reinforced pavement "70, similar in construction to the roadway 10, is depicted (and like reference numerals will be used to denote similar or like parts). In forming the pavement 70, rather than locating the pavement on the ground, the ground is excavated to form a trench 72 in which the pavement is laid.
Typically, a 75 mm bed of sand 74 is deposited in the base of the trench after excavation to enable a fairly flat trench base to be provided and to minimise ingress to the trench of even finer particles. Geofabric 76 (or other porous sheet) is then laid on top of the sand bed, and tyre mattress 14 is then laid on, in-filled and wrapped in the geofabric. Mattress 12 is then laid on wrapped mattress 14 and is in-filled typically with crushed stone 16 or cobble of 40 to 75 mm particle size to produce the finished pavement. During each in-filling step the fill material is preferably compacted to enhance stability, with tyre open upper ends enabling enhanced compaction.
Figure 9 (at 78) also illustrates how each tyre upper sidewall has been removed, to enable the aggregate to completely fill up each tyre and be compacted therein. In effect the tyres act as a reinforcing within the aggregate and also enhance the overall dimensional stability of each mattress.
Figures 10 and 11 show a similar arrangement to Figures 8 and 9, but in this case the pavement 70 forms a sub-base for a stockpile pavement 80 (eg formed from a concrete or a porous layer). Like reference numerals are used to indicate similar or like parts to those shown in Figures 8 and 9.
Because the stockpile pavement is typically formed of a heavier and denser material (eg a 300 mm slab) and typically supports heavy loads, a coarse sand layer 82 (typically thicker than 75 mm) is provided in the base of trench 72. In addition, a pair of agricultural drains
(typically of 100 mm diameter and slotted) are provided on either side of the trench for draining away any trapped water penetrating under the stockpile pavement.
Furthermore, because the stockpile pavement is typically laid over the pavement once it has been laid, geofabric 76 can also be provided to cover the upper tyre mattress 12, thereby preventing the ingress of concrete into the pavement fill material.
Referring now to Figures 12 to 14, fluid flow channels (similar to the drainage floors of Figures 5 to 1) are depicted. Like numerals are used to denote similar or like parts.
Figure 12 depicts a flow channel 90 formed from a two layer tyre mattresses 52, 54, and laid over a geofabric base 58. Side tyres 92 extend partway up the channel sloped bank and it can also be seen that the flow channel itself has a 1 in 20 slope into the centre thereof. This enables, for example, an agricultural drain to be positioned centrally within or under the mattresses to facilitate better drainage.
In Figures 13 and 14, the flow channel 90 can be provided with one or more intermediate weirs 100. Each weir includes tyre upper mattress layer 102 and tyre intermediate mattress layer 104. Furthermore, a silt barrier 106 can be provided between the upper mattress layers 102, 104 and lower mattress layers 52, 54. The upper mattress layers 102 and 104 extend transversely across the top of the lower mattress layer 52, 54 for the width of the flow channel to provide, in conjunction with the silt layer, the weir formation. It is typically desirable to have a weir formation in a flow channel, or on a drainage floor etc to assist in regulating flow through the channel and/or to provide a barrier to trap entrained solids in fluid flowing through the channel.
The silt barrier can function to prevent any fines being transported in the fluid flowing through the channel
A geofabric layer 12G underlies the wave mats on either side of the berm, and in some applications it may also be prudent to form the wave mat and the berm on an aggregate base 128. As can be seen, the geofabric layer extends under both wave mats and also into and through the service berm. This enhances the overall stability of the wave mat construction. The layer also prevents the ingress of finer material into the wave mat (which would otherwise cause deterioration thereof over time).
Figure 15 also shows that the aquaculture pond has a normal water level NWL-and a flushing water level FWL. In other words, during use of the aquaculture-pond, the water level changes and surges. The wave mat on either side of the service berm protects both the bank and the berm itself from erosion and scouring. The wave mat also absorbs the impact of the surging water, and this absorptive capacity is increased by the presence of the resilient tyres within the wave mat.'
Figure 16 shows a retaining wall and wave mat construction for a seawall or lakewall, where water forces are likely to be significantly greater than in an aquaculture pond. The wave mat 130 is, similarly to the aquaculture pond, formed from a plurality of tyres formed in rows and in-filled with an aggregate material 16. To enhance the stability and erosion resistance of the wave mat, a rock layer 132 (eg 250 mm thick) is positioned over the wave mat and provides sacrificial wear resistance, with the wave mat providing impact resistance and enhancing wave absorption capacity. The layer 132 can be sprayed over with a spray concrete to enhance unity and strength thereof.
The wave mat can be used in conjunction with a tyre retaining wall 134 (eg formed in accordance with the techniques of the applicant disclosed in PCT/AU98/00302). That retaining wall sits on a base 135 of coarse fill
material and between the base and the wave mat, a grave] fill layer 136 is provided.
The retaining wall includes a jacroc cover 137, a gravel infill backing layer 138, and a compacted backfill composite material layer 139. A concrete capping 140 (which can provide a walkway, a driveway etc) is positioned on top of the retaining wall. The lower end of the wave mat is provided with a number of stacks of tyres 142, which are typically infilled with either a denser compact fill material or concrete (to provide an anchor function). A gravel backfill layer 143 is provided behind tyre stack 142. Again, it is preferred that a geofabric layer 144 is laid under the wave mat 130 and tyre stack 142 to enhance the stability of the overall structure and to prevent the ingress of relatively finer material into the various fill materials employed in and between the tyres.
The wave mat arrangement of Figure 16 is more complex and more highly reinforced than that depicted in Figure 15, to cope with the greater and more consistent/frequent wave forces applied at sea retaining walls.
Referring now to Figure 17, a wave mat arrangement similar to that shown in Figure 16 is depicted and like reference numerals will be used to denote similar or like parts. In the wave mat of Figure 17, only the upper portion thereof is formed from filled tyres (at region 150). Typically the tyres in that region are packed with 150-250 mm rock aggregate 152 (and typically the top two rows are in turn typically then grouted therein with a mortar or concrete-type grouting). ft rock layer 154 is then placed over the wave mat (eg formed from 40 mm rock, typically 100 mm thick). The remainder of the wave mat is defined by a rock protection section 156, which is positioned between the wave mat section 150 and the tyre stack 142. This section is stabilised by the location of the tyre stack and tyre wave mat on either side thereof, and again a very stable structure results.
Referring now to Figures 18 to 21, a foundation in Uv form of a trickle filter construction 160 for stockpiles such as coal etc is depicted. For stockpiles requiring spraying with a fluid (eg. such as coal stockpiles) the construction can be located on the lee side of a dam wall DW of dam D. Figures 19 and 20 show how the trickle filter construction has opposing sidewalls formed from a plurality of 'stacked tyre rows 162, 164. Each tyre is infilled with a sand or chitter fill material 166 (chitter being a coal by-product). Typically the same fill material 168 is then deposited between the tyre rows. The tyre rows support an overlying condeck distributor trough 170 (or other folded metal trough) which provides a stable platform for the stockpile.
Referring specifically to Figure 20, the trickle filter construction includes a sand bed base layer 172. A polymeric liner 174 (eg. a geofabric material to prevent the ingress of finer material) is then positioned over the sand bed. However, if the liner is to be impervious to fluid flow thereacross it is typically formed from a non-porous layer (eg. high density polyethylene). A gravel base 176 is then positioned over the layer 174. The bottom tyre 177 of each of the stacked tyre rows is also infilled with gravel. The sand bed, liner and gravel base are all arranged within a trench 178 in which the trickle filter construction 160 is located. A filter cloth 180 (typically a geofabric material to prevent the ingress of finer material into the above located lowermost layer of the tyre sidewall) is then positioned on top of the gravel base. A geofabric layer can also be positioned between (and optionally wrapped around) each bottom tyre 177 and the base 176 to prevent the ingress of finer material into the tyre sidewalls. The tyres and fill 166, 168 are then progressively built up to form the trickle filter construction. Finally the condeck distributor is positioned on top of the construction.
Figures 21 and 22 show a similar trickle filter construction to Figures 19 and 20, but in this case the fill material region 168 is infilled with further stacked tyre rows 182, 184. The trickle filter construction is in all other respects identical to that shown and described for Figures 18 to 20, The arrangement in Figures 21 and 22 is, however, more stable because of the internal stacked tyre rows.
The use of tyres and fill in the trickle filler construction as described provides a stable yet fluid porous arrangement, which can also filter out stockpile fines to prevent them entering groundwater- and stormwater streams. The high drainage performance of the arrangement further tends to prevent the base of the stockpile from being dispersed into the stormwater. The arrangement can also be used with known "floc blocks" which entrap very fine material that may pass through the filter.
Referring now to Figures 23 to 21, a foundation is depicted in the form of a waste disposal cell base for use in a waste disposal leachate recirculation and distribution system.
Figure 23 shows a schematic plan view of one cell 200 in such a waste disposal system. The cell includes sidewalls 202, which define a square cell, and a distribution system 204 (Figure 24) which is defined by a plurality of tyres 206 arranged in predetermined patterns within the cell. The tyres are infilled with a stone or cobble material which is selected to provide a desirable filtration characteristic. Typically the fill also surrounds the tyres and fills up the remaining spaces in the cell.
As can be seen in Figure 25, the cell includes a seal and capping layer 208 which encloses the tyres 206, and which has an opening 210 through which leachate to be filtered can be delivered to the cell and from which gas G can be extracted.
The leachate is typically fluid (including water) that has passed through a rubbish/refuse pile, overlaying the cell.
As can be seen, tyre distribution channels 212 (which are defined by the tyres 206) are sloped downwardly and out from a distribution column 214, itself defined by a column of tyres (Figure 24). As can be seen, the distribution
channels slope outwardly and downwardly by approximately 2%
The base of the cell is defined by a liner 216 (typically a non-porous.polymeric liner or a water porous layer such as a geofabric layer can sometimes be used) which prevents the ingress of finer material into the cell. A sand and.gravel drainage base 218 is positioned on liner 216. Typically the sand and gravel base is covered by a geofabric layer 219 which can then also be wrapped around a lowest course of the tyres. The layer 219 is selected to allow the flow of leachate into base 218 whilst preventing the ingress of finer material into the cell. Thus, the drainage base receives fluid which has passed through the distribution channels (and has been appropriately filtered eg. by layer 219) and distributes this to a leachate underdrain 220 (for further treatment and/or disposal/release). Over time a layer of waste 222 accumulates in the cell, so periodically the cell is backflushed (eg. via pressurised fluid introduced at drain 220). The flow of leachate down through the distribution channel is illustrated schematically in Figures 26 and 27 (flow arrows F).
Turning now to Figures 28 and 29 there is shown a tyre 12 having the upper sidewall 19 removed therefrom (eg cut therefrom using a tyre sidewall cutter) but leaving the lower sidewall 19' intact. Such tyres are the most preferred tyres used in the various foundations described above.
Figure 30 shows the tyre 12 cut a 3 most: substantially right around its tread portion, but so as to leave a hinge line 21. This hinge joins the resultant tyre halves to each other, and provides an open upper portion in each tyre half for receiving aggregate fill therein etc. This arrangement can also be used in any of the foundations described above. Of course, the halves can be separated and can be used individually, but by leaving the halves joined at hinge line 21, an even stronger structure can be obtained. Such arrangements can provide an equivalent function to the tyre of Figures 28 and 29 when used in the various foundations described.
Referring now to Figures 31 to 36, various tyre matting arrangements 230 are shown and which can be used in various of the foundations described above. A plurality of tyres 12 (and/or tyres 14) are joined together by connecting elements 240. The connecting elements can be formed from tie ropes of synthetic or natural fibre, from metal clips, wire, bands, etc.
In Figure 34, it can seen that a coiled length of tyre tread or conveyor belt 250 can be positioned between adjacent tyres to place the elements 240 in tension, thereby strengthening the bond between the adjacent tyres.
In Figure 35, it can be seen how upper tyres 12 can be fastened to lower tyres 14 through fastening holes 252, using appropriate fastening pins 254 (eg. bolts, rivets, clamps or other similar arrangements). Again, this further increases the stability of a foundation employing mattresses configured in this manner.
Figure 36 shows a row of tyres 12 which are joined to each other (typically at least on one side thereof) via a length of tyre tread or conveyor belt 260 (eg via bolting, riveting, adhesion, ties etc). Again, such a configuration can be employed in any of the foundations described above.
Referring now to Figures 43 to 45, causeway 300 includes a pavement 302, a rock-filled tyre layer 304 and a sand-filled tyre layer 306. The causeway terminates at end wall 308 which provides a barrier to water flow in the direction of arrow F'.
Layer 302 can be formed of concrete (eg, fibre reinforced concrete, 300 mm thick), coarse road rock etc. As seen in Figures 44 and 45, layer 304 is formed from three courses of rock-filled tyres 310, and layer 306 is formed from two courses of sand-filled tyres 312. Typically the rock used in the layer 304 is 40 to 70 mm in size, and typically layer 304 is 750 mm thick. Typically the sand-filled layer 306 is 500 mm thick.
End wall 308 is defined by ten stacked rows of rock-filled tyres 314. Typically the rock used in the end wall tyres is 100 to 200 mm in size for maximum drainage. In addition, a geofabric layer 316 is wrapped around the outer tyre courses to prevent the ingress of relatively finer material into the rock of tyres 314. The layer 316 can also be wrapped around the lowermost tyre course, or around course layer 306.
Inner section 318 of wall 308 is typically a sacrificial layer (eg. formed from concrete, rock etc) and absorbs the bulk of the energy of fluid flowing through the causeway (eg. in the direction of arrow F).
As seen in Figure 45, under-causeway drains 320 are provided and are supported in discrete concrete elements 322 (eg. fibre reinforced concrete). The drains are located in layer 306 and extend through the causeway and transport away any water permeating through the causeway, thus maintaining the structural integrity of the causeway. Typically all of the tyres used in causeway 300 have an upper side wall removed therefrom to enable close packing of fill material therein.
Referring now to Figures 46 to 47A, a roadway intersection 330 is provided for a downwardly sloping
roadway 332 and a horizontal roadway 334. Each roadway is constructed from two courses of tyres 336, 331 formed in accordance with the present invention. In this regard, typically each tyre has its upper side wall removed therefrom and is in-filled with a rock or cobble material. In addition, typically the lower course of tyres 337 is wrapped with a geofabric layer 338 to prevent the ingress of finer material therein.
At the intersection of the two roadways, the upper course of tyres 336 is replaced with a concrete slab 340 (typically 200 mm thick.) and typically reinforced with a steel mesh 342 (eg. F82 mesh). The slab stabilises the intersection and prevents impact erosion from fluid streams flowing across the intersection {eg. down roadway 332).
The lower side of roadway 332 is provided with a drainway which has a first section 344 extending across the roadway and a second section 346 extending along a side edge of the roadway. ' Drainage section 344 is located beneath the first row of tyres in course 336 in the downwardly sloping section of roadway 332. This row is the first row to receive water flowing off the concrete slab, and thus a significant proportion of the water draining through roadway 332 can be captured in drainage section
344.
The second drainage section 346 receives fluid from section 344 and terminates in a pump out sump 348 located at the side of the roadway. The sump can be fitted with a suitable pump to pump water away from the roadway. Typically each drainage section is formed from agricultural
pipe.
As best seen in Figure 47, each drainway section is surrounded by a drainage region 350, typically composed of a free draining backfill material (eg. blue metal, rock, cobble etc). As also shown, the geofabric layer extends around region 350 to again prevent the ingress of a finer
road-degrading material therein, and which would otherwise cause drain blockage.
Referring now to Figures 48 and 49, an alternative means for in-filling a tyre with an upper side wall removed therefrom is shown. 'The tyre 360 has its lower side wall 362 intact but its upper side wall removed therefrom as shown. Two lengths of tyre tread (or conveyor belt) 363 and 364 are arranged within the tyre as shown. Spacer elements 366 (typically formed from small sections of tyre tread) are positioned as shown between the tyre lengths and are joined thereto by pins 361. The spacer elements maintain a space between adjacent lengths -and also between the tyre inner wall.
Fill material 368 (eg. sand, fine rock etc) is then dispersed around the tyre tread lengths as shown, and so the tyre tread lengths provide an additional reinforcing function to the fill material within the tyre. Thus, not only may fill material be compacted within the tyre (by virtue of the upper side wall removal), but it may also be reinforced therewithin, which further enhances the structural integrity of the tyre in any foundation in which it employed.
Figure 49 shows the tyre of Figure 38 in cross section and when located in a foundation structure generally indicated as 370. A cover layer 372 (eg. a roadway or causeway upper layer, a concrete slab, pavement etc) is provided above the tyre. Optionally, cut tyre side wall 374 (eg. the upper side wall of the tyre) can be placed in/at the lower opening of the tyre to provide support for inner tyre tread length 364.
Referring now to Figures 50 to 52, a roadway 380 formed using reinforced tyres 360 is depicted. As previously described, the roadway may be formed from one course only, or one or more additional offset upper courses 382 (shown in dotted outline) can be provided.
Referring to Figure 53, typically a geoiabric layer 384 is provided around the lower tyre course, to prevent the ingress of finer material into the tyres (eg. from or via the sand subgrade base 386).
Referring to Figure 52, a construction similar to Figure 51, but more deeply recessed into surrounding ground G is shown. To stabilise the ground and roadway, a kerb 390 can be provided on both sides of the roadway. Typically the kerb 390 is formed' from a pair of folded tyre walls 392 (or optionally a pair of folded tyre treads, or various combinations of.walls and treads). The folded walls can be joined by pins 394 (eg. galvanised steel pins). Thus, a kerb and gutter type configuration can be provided with the roadway.
The roadway 380 of Figures 50 to 52 is, in all other respects, similar in construction to the other roadways described herein in more detail.
Referring now to Figures 53 and 54, an alternative bank protection foundation 400 is shown. The bank protection foundation includes a bank protection mat 402 (eg. a wave mat) having an upper region 404 formed from internally reinforced tyres 406. The mat also includes a lower region 408 formed from tyre side walls 409 and tyre tread lengths (or conveyor belt lengths) 410.
The tyres 406 are internally reinforced somewhat similarly to tyre 360 (of Figures 48 and 49). However, in tyres 406, a stack 412 of tyre side walls is arranged within each tyre, to be virtually flush with the upper opening of each tyre (ie. the opening that results from the removal of the tyre upper side wall). In addition, a spiral coil 414 of tyre tread length (or conveyor belt length) is arranged within the side wall stack 412.
In one preferred arrangement the length 410 can extend from the uppermost (horizontal) tyre 406' and right throughout the mat 402 to lowermost tyre side wall 409' . Length 410 also provides a support (similar to cut tyre
side walls 374 in Figures 48 and 49) for the spiral coil 414. The length also greatly enhances the unitary structure of mat 402.
As best seen in Figure 53, spiral coils 416 of tyre tread (or conveyor belt) can also be provided in the space between four adjacent tyres as shown. Coils 416 have a tendency to unwind and thus put pressure on the adjacent tyres. This has the effect of tensioning up the entire mat structure, thus enhancing its unitary configuration. The coils also enhance any wave force absorption when adjacent tyres are impacted upon.
Uppermost tyre 406' is located adjacent to a concrete edging (eg. pathway) 418, and is pinned there against by an upper anchor pin 420. Similarly, the lowermost tyre 406" is pinned in positioned by lower anchor pin 421.
Typically the tyres 406 are in-filled with'a rock or cobble material, and a plastic membrane 422 (eg. PVC sheet) is arranged under the upper region 404 to prevent water from passing through the mat, and enabling it to drain down into the lower region 408 (and thus back into the adjacent water body). The more open configuration of the lower region 408 also enables water to drain therethrough (eg. water that has flowed down out of the upper region).
A geofabric layer 424 is provided under the plastic membrane, again to prevent the ingress of finer material into the mat construction. It may also be wrapped around and fastened to the entire mat (eg. by fastening pins, clamps etc).
Typically the tyres in mat 402 are all pinned together (eg. using galvanised pins or clamps, nuts and bolts etc) and the lengths 410 and coils 416 are also typically pinned to the tyres 406 and the tyre side walls 409.
Referring now to Figures 55 to 58, a foundation in the form of a silt trap unit 430 is depicted. In Figure 58, an exposed form of a silt trap unit 430 is shown at the end of the drainage channel 432, the silt trap unit being located
at the terminus of the drainage channel to drain 434. In use, the unit is typically covered (buried) by a fill/drainage material such as sand, rock or similar and is optionally wrapped in a porous geofabric layer (to prevent the ingress of fine material).
In Figures 55 to 57, six silt trap units are arranged at the terminus of a larger drainage channel or causeway 436, terminating at drain 438 (eg. a concrete pit).
Each silt trap unit 430 includes three tyres 440 (having an upper side wall removed therefrom) and joined together. The unit is-further integrated by wrapping around the three tyres and fastening thereto tyre tread lengths (or conveyor belt lengths) 442 as shown.
In construction of the silt trap drain, the ground G adjacent to the drain is excavated, and the silt trap units are laid therein. Typically the silt trap(s) are also laid on (or wrapped in) a geofabric layer 444 prior to being laid in the excavated site and filled. The silt traps are then filled {and are typically covered) with a fill material (eg. sand, fine or coarse grade rock, blue metal or cobble etc) and parts of the silt trap may then be recovered by the ground G (as best shown in Figures 55 and 56), providing a slope into the traps.
The silt traps are filled to have a natural drainage capacity, more so than the surrounding ground, and thus any fluid born solids (silt) in water that is flowing down through the drainage channel or causeway and over the silt traps, can be deposited and thus trapped in the silt trap. This helps to minimise or eliminate drain blockage with silt. The silt traps can be periodically cleaned if necessary.
Referring now to Figure 59, a foundation in the form of alternative silt trap unit 450 is shown, arranged at the terminus of V-drainway 452 to drain 454. The unit is surrounded by tyre tread lengths (or conveyor belt) 456 and again is typically wrapped in a porous layer (such as
geofabuc textile). However, rather than employing only whole tyres (each with an upper side wall removed therefrom) the unit includes both whole tyres 440 and half tyres 458 (both still having an upper side wall removed therefrom).
Each half tyre defines an individual silt catchment region, with the curve of the half tyre facing the oncoming fluid flow down drain 452. Thus an enhanced (doubled) trapping function (over the unit 430) is provided by unit 450.
In all other respects, the unit 450 can be constructed and positioned in place as per the units 430 of Figures 55 to 58.
The general steps involved in construction of, for example, a roadway or drainage floor will now be outlined for illustrative purposes only.
1. Minimal (if any) site excavation is conducted
depending on the sub-base stability and requirement
for excavating trenches in providing edge support.
2. Geofabric cloth or another suitable porous sheet is
laid at the location of the roadway or drainage floor
with excess geofabric provided on opposing sides of
the roadway or drainage floor to allow for wrapping of
the geofabric about at least the lower mattress of
tyres.

3. The lower mattress of tyres (typically already having
the upper sidewall removed therefrom) is located on
the geofabric and a suitable fill material, preferably
relatively coarse aggregate, is spread between and
through the tyres of the lower mattress and is
typically then compacted.
4. The excess geofabric is wrapped over an upper surface
of the lower mattress thereby enveloping the tyres of
the lower mattress together with the bed of rock
aggregate.
5. An upper layer of tyres (again having the upper
sidewall removed) is located upon and in a staggered
relationship relative to the lower mattress of tyres.
The upper layer can also be located on a geofabric
cloth or porous sheet, optionally with excess cloth
being provided for upper layer wrapping.
6. The upper mattress of tyres is in-filled with the
relatively coarse aggregate material and is typically
then compacted. Usually surplus aggregate is
provided so as to form a layer of aggregate above the
upper mattress of-tyres.
The applicant has conducted tests on -roadways and similar foundations constructed in accordance with the steps described above. The preliminary tests involved passing a laden truck of approximately 21 tonne across both a single and two-layered tyre mattress similar to that described. The foundation was constructed on a sub-base with no preparation having a relatively high level of saturation. The foundation showed no signs of degeneration or any associated problems during the testing.
Now that several preferred embodiments of the present invention have been described in some detail it will be apparent to those skilled in the art that the foundations described, and associated methods of construction, have at least the following advantages:
1. The foundation can be constructed with limited
sub-base preparation eliminating the need for
relatively heavy earthmoving machinery;
2. The foundation has one or more layers of tyres
together with a suitable fill material.and is thus
well suited to construction upon relatively unstable
or saturated ground;
3. The positioning of a layer porous to water but
impervious to finer grade material under the lowermost
layer enhances the life of the foundation, and
minimises fill degradation (due to the ingress of relatively finer material); A. The foundation is relatively inexpensive and simple to
construct whilst requiring minimal maintenance; and 5. The foundation disposes of and utilises efficiently
waste and used tyres, conveyor belts, and other waste materials {which otherwise represent an environmental hazard).
Those skilled in the art will appreciate that the invention described herein is susceptible to variations and modifications other than those specifically described. For example, the foundation may be formed from-one or more tyre layers depending largely on the ground stability and loading requirements. The fill material may alone provide sufficient drainage capacity to avoid silting of the fill material bed.
Construction of the various foundation.arrangements may vary in specific detail whilst remaining within the scope of the present invention. For example, the lowermost layer or mattress of tyres may be laid upon a bed of tyre sidewalls, rather than directly upon the ground/sub-base or geofabric cloth, which bed can provide added stability to an otherwise relatively unstable or saturated sub-base. Those sidewalls may also be tied together (similar to those techniques described above). The drainage floor, wave banks etc may be extended to include a single or multi-layered tyre mattress extending up the embankment. A silt barrier formed of one or more tyre layers extending transversely across the drainage floor together with a throughgoing pipe may also be provided to remove silt flowing along the drainage floor. The silt barrier can function in the same way as a "berm" with the silt barrier tyres being located upon and the throughgoing pipe passing through a bed of stone provided on the drainage floor.
Of course tyres from any vehicle type can be employed in the various foundations in accordance with the present
invention including car, truck, tractor, four-wheel drive automobiles, etc.
All such variations and modifications are to be considered within the scope of the present invention, which can be embodied in many other forms.




We Claim;
1 . A foundation comprising one or more layers of Lyres
including a lowermost layer being located adjacent, to the ground, and a fill material provided within tyrer, of each of the layers, wherein at least the lowermost layer has a porous sheet positioned thereunder which is adapted for allowing the passage of water across the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer.
2. A foundation as ciaimed in claim 1 wherein the
lowermost layer is at least partly enclosed by the
porous sheet.
3. A foundation as claimed in claim 1 or claim 2 wherein
at least some of the tyres have a side wall removed
therefrom.
A. A foundation as claimed in claim 3 wherein all tyres have their in use upper sidewall removed therefrom, and in use fill introduced therein is compacted in each layer and in each tyre. 5. A foundation as claimed in any one of the preceding
claims wherein the tyres within each of the layers are laid generally horizontally and are located adjacent to one another in a fixed array, with each of the layers in conjunction with the fill material forming a tyre mattress.
6. A foundation as claimed in claim 5 wherein at least two layers of tyres are provided, and wherein each tyre in each layer has a sidewall removed therefrom so that the tyres can be oriented to be generally upwardly open in use to receive the fill material therein.
1. A foundation as claimed in claim 5 or claim 6 wherein the layers of tyres or tyre mattresses are offset with respect to adjacent layers to provide distribution of the load between adjacent tyres.
8. A foundation as claimed in claim "7, wherein one lyre
in one layer overlays up to four tyres in an
underlying adjacent layer.
9. A foundation as" claimed in any one of the preceding
claims wherein the porous sheet is a geofabric textile
layer allowing the passage of water across the
lowermost layer whilst preventing the ingress of
matter of a grade finer that the fill material into
the lowermost layer.

10. A foundation as claimed in any one of the preceding
claims wherein the. fill material is a rock aggregate
or cobble of a relatively coarse grade.
11. A foundation as claimed in any one of the preceding
claims further comprising an edge support structure
that is located on opposing sides of at least an
uppermost layer of the layers of tyres, wherein the
support structure is adapted to inhibit lateral
movement of the tyres.

12. A foundation as claimed in claim 11, wherein the edge
support structure includes a row of support tyres
located alongside and coupled via a link structure to
at least one side of the uppermost layer of tyres.
13. A foundation as claimed in claim 12, wherein the link
structure includes a series of lateral tie elements
each linking one of the support tyres to an adjacent
tyre of the uppermost layer and a longitudinal link
element interconnecting the tie elements.

14. A foundation as claimed in claim 13, wherein the
lateral tie elements and longitudinal link elements
are constructed of tyre tread connected end to end, or
are constructed of conveyor belt material.
15. A foundation as claim in any one of the preceding
claims, further comprising a series of drainage tyres
located adjacent to one another within a trench
excavated underneath the lowermost layer of tyres,
with a drainage fill material being provided within or
between the drainage tyres. 16. A foundation a claimed in claim 15, wherein one or
more drainage channels extend from the trench so aS to
drain water away therefrom. 11. A foundation as claimed in any one of the preceding
claims wherein at least some of the tyres within the
foundation have tyre portions arranged therewithin as
additional reinforcement.
18. A foundation as claimed in claim 11, wherein, in
addition to fill material, each tyre with its upper
sidewall removed therefrom has one or-more coiled tyre
treads arranged therewithin, or a stack of tyre
sidewalls arranged therewithin, or combinations
thereof.
19. A foundation as claimed in any one of the preceding
claims wherein each tyre employed has an intact tread
portion.

20. A foundation as claimed in claim 19 wherein, when the
foundation is employed in drains, drainage channels,
silt traps and the like, part tyres are also or
optionally employed.
21. A foundation as claimed in claim 20, wherein each part
tyre is half a tyre but still having an upper side
wall removed therefrom.

22. A foundation as claimed in claim 20 or claim 21, that
is formed by arranging a single lengthwise row of
tyres, and by wrapping the row with length(s) of tyre
tread or conveyor belt to form an integrated and
portable unit.
23. A foundation as claimed in claim 22, wherein each unit
has three tyres arranged end to end, each with an
upper sidewall removed therefrom, and with tyre tread
or conveyor belt length(s) extending right around and
joined to the tyres.
24. A foundation as claimed in any one of claims 1 to 19 that is provided within:
a road; ground or sub base in sand and wetlands; a drainage way, course or channel; a railway track base; a mining road or tunnel; a ramp, slope or mat adjacent to lakes, rivers creeks, oceans; a wave dissipation or breakwater wall; a waste cell pit; a stockpile base or pavement; or a silt trap.
25. A foundation comprising one or more layers of tyres
including a lowermost layer being located adjacent to the ground on a geofabric material, with tyres in the lowermost layer having an upper sidewall removed therefrom and being provided with a fill material therewithin,
wherein the lowermost layer is enclosed within the geofabric material, and further fill material
and/or one or more further layers of tyres overlay the enclosed lowermost layer to define the foundation. 26. A method of constructing on ground a foundation as
defined in any one of the preceding claims including the steps of:
forming one or more layers of tyres including a lowermost layer;
positioning on the ground a porous sheet which is adapted, for allowing the passage of water across the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer;
locating the lowermost layer on the porous sheet adjacent to the ground; and
filling within tyres of each of the layers with the fill material.



Documents:

abstract.jpg

in-pct-2001-00186-del-abstract.pdf

in-pct-2001-00186-del-claims.pdf

in-pct-2001-00186-del-correspondence-others.pdf

in-pct-2001-00186-del-correspondence-po.pdf

in-pct-2001-00186-del-description (complete).pdf

in-pct-2001-00186-del-drawings.pdf

in-pct-2001-00186-del-form-1.pdf

in-pct-2001-00186-del-form-19.pdf

in-pct-2001-00186-del-form-2.pdf

in-pct-2001-00186-del-form-3.pdf

in-pct-2001-00186-del-form-5.pdf

in-pct-2001-00186-del-gpa.pdf

in-pct-2001-00186-del-pct-101.pdf

in-pct-2001-00186-del-pct-210.pdf

in-pct-2001-00186-del-pct-401.pdf

in-pct-2001-00186-del-pct-409.pdf

in-pct-2001-00186-del-petition-137.pdf


Patent Number 214968
Indian Patent Application Number IN/PCT/2001/00186/DEL
PG Journal Number 10/2008
Publication Date 07-Mar-2008
Grant Date 19-Feb-2008
Date of Filing 05-Mar-2001
Name of Patentee ECOFLEX AUSTRALIA PTY. LIMITED
Applicant Address 41-45 NEWCOMEN STREET, NEWCASTLE, NEW SOUTH WALES 2300, AUSTRALIA
Inventors:
# Inventor's Name Inventor's Address
1 CALLINAN, GARY KEVIN 20 RANCLAUD STREET, MEREWETHER, NEW SOUTH WALES 2291, AUSTRALIA
2 CHAPMAN, PETER 105 TARINGA PARADE, INDOOROOPILLY, QEENSLAND 4068, AUSTRALIA
PCT International Classification Number E01B 1/00
PCT International Application Number PCT/AU99/00640
PCT International Filing date 1999-08-06
PCT Conventions:
# PCT Application Number Date of Convention Priority Country
1 PQ1575 1998-12-21 Australia
2 PP5836 1998-08-06 Australia
3 PQ0454 1999-04-28 Australia