| Full Text | WO 2005/073412	PCT/AU2005/000112 IRONMAKING AND STEELMAKING Field of the Invention
 The present invention relates to steelmaking, particularly steelmaking in an integrated steelmaking plant.
 The present invention also relates to ironmaking, particularly via a molten bath based direct smelting process.
 The present invention is concerned with improving the economics of operating steelmaking plants, particularly integrated steelmaking plants, by making effective use of steelmaking slag and dusts and other steelmaking plant by-products that are generally regarded as low value wastes.
 The present invention makes it possible to use these steelmaking by-products as feed materials to an ironmaking process and thereby reduce:
 (a)	the overall amount of waste that is produced
 by ironmaking operations and steelmaking operations; and
 (b)	the amounts of feed materials for ironmaking
 operations that are required from other sources.
 The present invention is based on the use of a direct smelting process and apparatus for producing molten iron (which term includes ferrous metal alloys) that is capable of using steelmaking plant by-products, such as steelmaking slag and dusts, as a feed material for the direct smelting apparatus.
 The direct smelting process and apparatus may be
 
 WO 2005/073412	PCT/AU2005/OO0I12
 2
 part of an integrated steelnaking plant or nay be a separate operation altogether that processes steelmaking by-products produced in one or more than one separate steelmaking operation.
 Background of the Invention
 Traditional iron and steelmaking processes produce slag.  Both ironmaking slag and steelmaking slag are considered to be waste products of these respective processes.
 Steelmaking slag typically contains iron units in the form of FeO and flux units in the form of lime (CaO) . Typically, the iron units are 35% by weight of the slag and the flux units are 25-35% by weight of the slag.
 When the steelmaking slag is disposed of in accordance with prior art practice, the iron and lime units are lost.
 Significant economic and environmental benefits would be gained if it were possible to recover or reuse iron and lime units from steelmaking slag.
 Recycling of steelmaking slag to prior art ironmaking vessels such as traditional blast furnaces in order to recover or reuse the iron and lime units is not considered to be a viable option.  One reason for this is that phosphorus in feed materials that are supplied to typical blast furnaces tends to partition to the molten iron produced in the furnace.  When this molten iron is subsequently supplied to a steelmaking vessel, the phosphorus partitions into the steelmaking slag in order to produce steel of required chemistry.  Thus, recycling steelmaking slag to a typical blast furnace is not practical and would simply result in an increasing
 
 WO 2005/073412	PCT/AU2005/000112
 3
 phosphorus load in down stream steelmaking vessels.  This is undesirable.
 Whilst blast furnaces are the traditional option for producing iron from iron ore, various molten bath-based direct smelting processes have been proposed with a view to avoiding disadvantages of blast furnaces, suoh as the need for sintering and coke making operations.  Such direct smelting processes include, by way of example, the Romelt, DIOS (Direct Iron Ore Smelting), and HIsmelt processes.
 The Romelt process operates at ambient pressure using a molten iron and slag bath with ore fines and non-coking coal dropped in from above.  Oxygen and an air/oxygen mixture are injected at each of two elevations through side tuyeres to stir the melt and post-combust bath gas.
 The DIOS process is another molten iron and slag bath-based process and operates under pressure (1 to 2 bar g) and uses top-feed of coal and ore.  Unlike Romelt, it uses a top lance for oxygen injection and has a fluidised bed system for iron ore pro-reduction.  In the smelter, most of the reduction occurs in a foamy slag layer.  There axe significant temperature and FeOx gradients within the reactor (higher temperatures and higher FeOx levels at the top of the slag layer).
 The HIsmelt process developed by the applicant is another molten iron and slag bath-based process and differs from 'deep slag' smelters such as DIOS and Romelt in that the solids fed to the vessel are injeoted significantly deeper into the melt.  This leads to stronger mixing in the vessel, with hardly any temperature gradients in the liquid.  The HIsmelt process is described, by way of example, in International
 
 WO 2005/073412	PCT/AU2005/000112
 4
 applications PCT/AU96/00197 (WO 96/31627) and PCT/AU01/00222 (WO 01/64960) in the name of the applicant and the disclosure in these International applications is incorporated herein by reference.
 It has previously been reported that the HIsmelt process is able to process iron ores such as high phosphorus Brockman ores and produce a pig iron with less than 0.05% phosphorus for downstream steelmaking.  In contrast to the traditional blast furnace, the HIsmelt process has a more oxidising slag which results in extremely effective partitioning of phosphorus to the slag.  During pilot plant testing it was reported by the applicant that 90 to 95% of the phosphorus fed to the HIsmelt pilot plant vessel reported to the slag.  The DIOS and Romelt processes are also believed to preferentially partition phosphorus to slag.
 It has also previously been reported that steelmaking slag in the form of fines can be used as a feed material that is supplied directly to a direct smelting vessel operating in accordance with the HIsmelt process - see paper entitled "HIsmelt - Competitive Hot Metal from Ore Fines and Steel Plant Wastes" by the subject inventor, R J Dry, and others, prepared for METEC Congress, 14-15 June, 1999.  The left hand column on page 4 of the paper mentions that steel plant reverts, including BOF slag, can provide carbon credits that reduce the coal requirements for the HIsmelt process flowsheet shown in Figure 3 of the paper.
 Summary of the Invention
 The applicant has carried out further research work into possible applications of the HIsmelt process and has realised that there is substantial scope to use steel plant reverts, particularly steelmaking slag and dusts, as
 
 WO 2005/073412	PCT/AU200S/000112
 5
 sources of icon units and flux units in direct smelting processes, suoh as the HIsmelt process.
 In particular, in the context of integrated steelmaking, the applicant has realised that an integrated steelmaking plant that includes direat smelting operations that can efficiently partition phosphorus to the slag and steelmaking operations can be operated so that:
 (a)	the direct smelting operations take a
 substantial proportion, typically at least 70% by weight,
 of the steelmaking slag and dusts that would otherwise be
 regarded as low value wastes and use these steelmaking by-
 products as a valuable part of the feed materials that
 contribute iron and flux units for the direot smelting
 operations; and
 (b)	the low phosphorus iron produced in the
 ironmaking operations can be used as a feed material for
 the steelmaking operations.
 The overall outcome of the above realisation is (a) production of molten iron that can be used in the steelmaking operations, (b) a significant reduction in the net amount of slag and dust produced by the plant, and (c) a significant reduction, typically at least 30% by weight, of the amount of flux that is required from other sources.
 In addition, in particular, in the context of ironmaking, the applicant has realised that a direct smelting apparatus that includes a pre-treatment unit that at least preheats and optionally also prereduces ferrous feed material and a process based on the use of the pre-treatment unit and a direat smelting vessel is a particularly effective option for processing steelmaking slag, with the steelmaking slag being supplied at least in part to the direat smelting vessel via the pre-treatment
 
 WO 2005/073412	PCT/AU2005/000112
 6
 unit.  This direct smelting apparatus and proaess may be part of the above-described integrated steelmaking plant or be a separate independent operation altogether that prooesses steelmaking by-products, such as steelmaking slag and dusts, from one or more than one steelmaking operation.
 According to the present invention there is provided, in broad terms, a steelmaking process that includes the steps of:
 (a)	producing molten steel and molten
 steelmaking slag in a steelmaking process in a steelmaking vessel, the steelmaking slag including iron units and flux units; and
 (b)	producing molten iron in a direct smelting
 process in a direct smelting vessel containing a molten
 bath of iron and slag using a substantial portion of the
 steelmaking slag as part of the feed material requirements
 for the direct smelting process.
 Preferably step (b) includes using at least 70% by weight of the steelxnaking slag as part of the feed material requirements for the direct smelting process.
 More preferably step (b) includes using at least 80% by weight of the steelmaking slag as part of the feed material requirements for the direct smelting process.
 It is preferred particularly that step (b) includes using at least 90% by weight of the steelmaking slag as part of the feed material requirements for the direct smelting process.
 Preferably step (b) includes using sufficient steelmaking slag to provide at least 50% by weight of the
 
 WO 2005/073412	PCT/AU2005/000112
 7
 flux units of the feed material requirements of the direct smelting process.
 Preferably the process is an integrated
 steelmaking process and includes producing molten iron in at least one ironmaking vessel and supplying the molten iron as a ferrous feed material for step (a) .
 The ironmaking vessel may be any suitable ironmaking vessel such as a blast furnance and a molten bath-based direct smelting vessel.
 The process may include using iron produced in step (b) as at least part of the ferrous feed material for producing steel in step (a) .
 The process may include using iron produced in step (b) and in at least one other ironmaking vessel as the ferrous feed material for producing steel in step (a).
 Preferably step (b) includes controlling the direct smelting process to smelt the ferrous feed material and substantially partition phosphorus to the slag.
 Preferably the direct smelting process is a HIsmelt process. The direct smelting process may be any other molten bath-based direct smelting process.
 Preferably the process includes pre-treating ferrous feed material including steelmaking slag containing iron and flux units for step (b) by at least heating the ferrous feed material in a pre-treatment unit.
 Preferably the pre-treatment step includes heating and at least partially reducing the ferrous feed material in the pre-treatment unit.
 
 WO 2005/073412	PCT/AU2005/000112
 8
 Preferably the pre-treatment step includes preheating the ferrous feed material to at least 400°C, more preferably at least 700°C.
 Preferably the pre-treatment step includes
 preheating the ferrous feed material to a temperature less than 1050°C, more preferably less than 900oC.
 Preferably the pre-treatment step includes net scrubbing an offgas produced in the step and using wet sludge containing steelmaking slag in the process.
 In many situations it may be impractical to rely solely on the use of steelmaking slag as the sole source of flux due to the steelmaking slag typically including only 25 to 35 wt% CaO and the other constituents of the slag not being suitable as ironmaking flux.  Thus, for a known addition of lime, three times the tonnage of steelmaking slag would be required.  In these situations it is appropriate to add one or more additional slag forming agents.
 Preferably the direct smelting process includes using a slag forming agent to provide flux units for the process in addition to the flux units provided by the steelmaking slag.
 Preferably the direct smelting process includes injecting the slag forming agent directly into the direct smelting vessel as opposed to pretreating the slag forming agent before injection into the vessel as is the case with the steelmaking slag.
 Preferably the amount of the slag forming agent injected directly into the direct smelting vessel is sufficient to provide up to 30% by weight of the flux requirements of the direct smelting process.
 
 WO 2005/073412	PCT/AU2005/000112
 9
 Preferably the additional slag forming agent includes calaium oxide.
 More preferably the calcium oxide is in the form of lime, burnt lime, dolomite or combinations thereof.
 Preferably the process includes cooling the steelmaking slag produced in step (a) prior to using at least a portion of the steelmaking slag in step (b) .
 Preferably the process further includes reducing the size of the cooled steelmaking slag prior to adding the steelmaking slag in step (b).
 A particularly preferred size range is minus 6mm.
 According to the present invention there is also provided a steelmaking plant for producing molten steel in accordance with the above process that includes:
 (a)	a steelmaking apparatus for producing molten
 steel and molten steelmaking slag;
 (b)	an ironmaking apparatus for producing molten
 iron.
 According to the present invention there is also provided a direct smelting process for producing molten iron in a direct smelting vessel containing a molten bath of iron and slag, the process including the steps of:
 (a)	pre-treating ferrous feed material including
 steelmaking slag containing iron and flux units by at
 least heating the ferrous feed material in a pre-treatment
 unit; and
 (b)	direct smelting molten iron in a direct
 
 WO 2005/073412	PCT/AU2005/000112
 10
 smelting vessel containing a molten bath of iron and slag using the pro-treated ferrous feed material including steelmaking slag from step (a) as part of the feed material requirements for the direct smelting vessel.
 Preferably step 
Preferably step (a) includes preheating the ferrous feed material to at least 400°C, more preferably at least 700°C.
 Preferably step (a) includes preheating the ferrous feed material to a temperature less than 1050°C, more preferably less than 900°C.
 Preferably step (a) includes wet scrubbing an offgas produced in the step and using wet sludge containing steelmaking slag in the process.
 Preferably the process includes using a slag forming agent to provide flux units for the process in addition to the flux units provided by the steelmaking slag.
 Preferably the process includes injecting the slag forming agent directly into the direct smelting vessel as opposed to pretreating the slag forming agent before injection into the vessel as is the case with the steelmaking slag.
 Preferably the amount of the slag forming agent injected directly into the direct smelting vessel is sufficient to provide up to 30% by weight of the flux requirements of the direct smelting process.
 Preferably the additional slag forming agent
 
 WO 2005/073412	PCT/AU2005/000112
 11 includes calcium oxide.
 More preferably the calcium oxide is in the form of lime, burnt lime, dolomite or combinations thereof.
 Preferably step (b) includes controlling
 conditions within the direct smelting vessel to smelt the ferrous feed material to iron in the bath and to substantially partition phosphorus to the slag.
 Preferably step (b) includes controlling
 conditions within the direct smelting vessel to partition phosphorus to the slag by maintaining the slag in an oxidising condition whereby the partition ratio of phosphorus in the iron to phosphorus in the slag is at least 1:5.
 More preferably the above-described ratio is 1:10.
 It is preferred particularly that the ratio be in the range of 1:10 - 1:30.
 Preferably step (b) inoludes controlling
 conditions within the direct smelting vessel to partition phosphorus to the slag by maintaining the slag temperature to be in the range of 1350 - 1450°C and the amount of FeO in the slag to be at least 3% by weight.
 Preferably step (b) includes injecting the pre-treated ferrous feed material and a solid carbonaceous material, and an oxygen-containing gas into the vessel.
 The steelmaking slag added in step (b) may be sourced from any steelmaking plant using any known steelmaking process including but not limited to any of the BOF processes and/or electric arc furnaces (EAF).  In
 
 WO 2005/073412	PCT/AU200S/000112
 12
 either case, preferably the steelmaking slag is cooled in accordance with known techniques so as to be in the form of pellets, granules or powder.
 It is preferred that the steelmaking slag be generated within an integrated steelmaking plant including at least one direct smelting vessel and at least one steelmaking vessel at a single site, as described above.
 Brief Description of the Drawings
 Embodiments of the present invention are now described, by way of example only, with reference to the accompanying drawings, of which:
 Figure 1 illustrates schematically one embodiment of a process flowsheet;
 Figure 2 illustrates schematically another embodiment of a process flowsheet; and,
 Figure 3 illustrates schematically another (but not the only other) embodiment of a process flowsheet.
 Detailed Description of Embodiments of the Invention
 With reference to Figure 1, there is provided:
 (a)	an ironmaking apparatus including a pre-
 treatment unit in the form of a preheater, typically a
 shaft furnace or a fluidised bed, and
 (b)	a direct smelting vessel that is suitable
 particularly for operation by the HIsmelt process as
 described in International patent application
 PCT/AU96/00197, the contents of which are incorporated
 herein by reference.
 
 WO 2005/073412	PCT/AU2005/000112
 13
 In use, iron ore fines and steelmaking slag obtained from any external source are screened to 0 to 6mm size and are fed to the preheater.  Typically, the steelmaking slag includes 35% by weight iron units and 25-35% by weight flux units.
 The steelmaking slag and the iron ore are heated together in the preheater to a temperature in the range of 400 - 900°C and are fed to the direct smelting vessel.
 The direct smelting vessel includes injection lances (not shown) that receive hot ore fines and hot steelmaking slag from the preheater and inject these hot solids at a temperature of the order of 350 - 850°C into the vessel.
 Preheating steelmaking slag is not subject to the difficulties associated with preheating flux such as lime. The main difficulty with preheating lime is that lime that is taken up with offgas from the preheater tends to dissolve in wash water in wet scrubbers (not shown) that clean the offgas and are lost from the process.  This is a serious issue because of the high cost of flux. Steelmaking slag does not dissolve in scrubber water and therefore can be recovered in wet sludge produced in wet scrubbers and re-used in the process.
 In use, carbonaceous material, typically coal, and additional slag-forming fluxes, typically lime are also fed to the vessel.
 The direct smelting vessel includes injection lanoes (not shown) that receive and inject the carbonaceous material and the additional slag-forming fluxes into the vessel.  The carbonaceous material and fluxes may be blended together and injected and/or injected separately.
 
 WO 2005/073412	PCT/AU2005/000112
 14
 The injection of these additional fluxes directly into the vessel, as opposed to passing the additional fluxes through the preheater first as is the case with the steelmaking slag, is important as a control mechanism of the process.  Typically, such direct flux injection is up to 30% by weight of the total flux requirements.
 The HIsmelt process also operates with air or oxygen-enriched air and therefore generates substantial volumes of offgas which may be used for preheating the materials fed to the direct smelting vessel.
 The process conditions within the direct smelting vessel are controlled such that the phosphorus in any of the solid materials fed to the vessel partitions preferentially to the slag.  In the case of the HZsmelt process, this is achieved by ensuring that the FeO in slag is in the range 4-6% by weight and the temperature is in the range of 1400 - 1450°C.  Under these process conditions, the partition ratio of phosphorus in the slag to phosphorus in metal is in the range of 5:1 to 20:1.
 The hot metal produced in the direct smelting vessel is sufficiently low in phosphorus (less than 0.05% by weight) to be readily used as a feed material to a downstream steelmaking plant (not shown) which may be located on the same or at another site.
 With reference to Figure 2, there is provided an integrated steelmaking plant including one or more than one BOF and a direct smelting apparatus for producing hot metal as a feed to the one or more than one BOF.  The steelmaking slag from the BOF is recycled to form one component of the slag-forming flux to the direct smelting apparatus.  The direct smelting apparatus includes a preheater unit and a direct smelting vessel operating in accordance with the HIsmelt process as shown in and
 
 WO 2005/073412	PCT/AU2005/000112
 15 described above with reference to Figure 1.
 The one or more than one BOF is typically also charged with scrap metal prior to the addition of the ladles of hot metal from the direct smelting vessel. Typically, the scrap is charged first before the hot metal to avoid splashing.  After the scrap is charged, the hot metal is charged into the BOF.  Based on the chemistry of the charge and the temperature and the specific alloy being produced in the steelmaking process, the amounts of flux and oxygen added to the BOF are calculated.  As for ironmaking, the typical flux added includes CaO (from burnt lime) and MgO (from dolomitic lime) .
 When the oxygen blow is finished, the steelmaking slag is allowed to float to the top of the bath of the molten steel.  The steel is tapped from the BOF followed by tapping of the steelmaking slag.
 The steelnaking slag is typically tapped into slag pots (not shown) and either quenched or allowed to cool.  The cooled slag is fed to a means for processing the steelmaking slag, which may include size reduction apparatus such as crushers and screens and/or magnetic separators for recovering carried over steel.  The cooled and screened steelmaking slag is then fed to the preheater of the ironmaking apparatus.
 In the arrangement of Figure 3, in use, the steelmaking apparatus, such as a BOF, is charged with (a) hot metal from a direct smelting vessel as described above with reference to Figure 2 and (b) hot metal from a traditional blast furnace.  The steelmaking slag generated in the steelmaking apparatus is recycled to the direct smelting apparatus in the manner described above with reference to Figure 2.  As the traditional blast furnace is not able to tolerate high phosphorus feeds, the
 
 WO 2005/073412	PCT/AU2005/000112
 16
 steelmaking slag is not recycled as a flux to the blast furnace.  The typiaal partition ratio of phosphorus in the slag to phosphorus in the iron for a blast furnace is 0.1 compared with 10 to 20 for the BXsmelt process.
 The applicant has carried out computer modelling on the process flowsheets shown in Figures 2 and 3 and a Comparative flowsheet.
 The modelling work was based on the use of a pre-treatment unit/direct smelting vessel operating in accordance with the HIsmelt process and producing of the order of 0.8 million tonnes per annum (Mt/a) of molten iron.
 The modelling work was also based on the use of a BOF steelmaking vessel producing 0.7 Mt/a in the case of the Comparative and Figure 2 flowsheets and 2.4 Mt/a in the case of the Figure 3 flowsheet.
 Brief details of the results of the modelling work for the Comparative flowsheet and the Figures 2 and 3 flowsheets are set out below.
 Comparative Flowsheet - pre-treatment unit/direct smelting vessel and steelmaking vessel, with no steelmaking slag return to the pre-treatment unit.
 In accordance with the model, the hot metal feed to the steelmaking vessel is 104.9 t/hr iron.  The steelmaking vessel produces 6.6 t/hr slag and 1.6 t/hr dust.  The direct smelting vessel takes no slag and no dust.  The slag and dust are disposed of in accordance with standard practices.   The iron ore feed to the direct smelting vessel is 197.5 t/hr iron ore fines and recycled smelting process dust.  The direct smelting vessel produces 32.9 t/hr slag and 104.9 t/hr iron.
 
 WO 2005/073412	PCT/AU2O05/0O0112
 17
 Figure 2 Flowsheet - pre- treatment unit/direct smelting vessel and steelmaking vessel, with steelmaking slag return to the pre-treatment unit.
 In accordance with the model, the hot metal feed to the steelmaking vessel comprises 105.7 t/hr iron.  The steelmaking vessel produces 6.7 t/hr slag and 1.6 t/hr dust.  The direot smelting vessel takes 6.0 t/hr slag and 1.4 t/hr dust.  These amounts equate to 89.5% and 87.5%, respectively of the slag and dust produoed by the steelmaking vessel.  The total iron ore feed to the direct smelting vessel is 192.8 t/hr iron ore fines, steelmaking slag, steelmaking dust, and recycled smelting process dust.  The direct smelting vessel produces 33.9 t/hr slag and 105.7 t/hr iron.
 When compared with the Comparative flowsheet, and bearing in mind that both processes produced substantially the same amounts of molten iron and the same amounts of molten steel, it is evident that the impact of slag return was to:
 (a)	reduce total slag produoed by the steelmaking
 vessel and the direot smelting vessel by 4.9 t/hr; and
 (b)	reduce total iron ore feed requirements for
 the direct smelting vessel by 4.7 t/hr.
 Figure 3 Flowsheet - pre-treatment unit/direct smelting vessel, blast furnace, and steelmaking vessel, with steelmaking slag return to the pre-treatment unit.
 In accordance with the model, the hot metal feed to the steelmaking vessel comprises 200 t/hr iron from the blast furnace and 107.9 t/hr from the direct smelting vessel.  The steelmaking vessel produces 32.6 t/hr slag and 5.6 t/hr dust. The direot smelting vessel takes 27.7
 
 WO 2005/073412	PCT/AU2005/000112
 18
 t/hr slag and 4.7 t/hr dust.  These amounts equate to 84.9% and 83.9%, respectively of the slag and dust produced by the steelmaking vessel.  The total iron ore feed to the direct smelting vessel is 205.6 t/hr iron ore fines, steelmaking slag, steelmaking dust, and recycled smelting process dust.  The direct smelting vessel produces 38.1 t/hr slag and 107.9 t/hr iron.
 It is evident from the above that a significant amount (27.7 t/hr) of slag from the steelmaking vessel is used in the direct smelting vessel and thereby reduces the iron and flux units required from other sources.
 The present invention has a number of advantages over the prior art, including:
 (a)	reducing the amount of waste steelmaking slag
 required to be disposed of from a steelmaking plant;
 (b)	recovering flux units and iron units in the
 steelmaking slag; and,
 (o) reducing the quantity of fresh flux and iron units required to be fed to an ironmaking process when using recycled steelmaking slag.
 Many modifications may be made to the embodiments of the present invention described above without departing from the spirit and scope of the invention.
 For example, whilst the embodiments of the present invention have been described in the context of the use of the HIsmelt process, it is understood that the present invention is applicable to any ironmaking process whereby the phosphorus fed to the ironmaking process reports preferentially to the ironmaking slag.  Such other ironmaking processes may include by way of example the
 
 WO 2005/073412	PCT/AU2005/000112
 19 Romelt and DIOS processes.
 In addition, whilst the embodiments of the present invention include pro-treatment units in the form of preheatars, the present invention extends to any suitable form of pre-treatment units and to arrangements that do not include preheaters.
 
 WO 2005/073412	PCT/AU2005/000112
 20
 Claims:
 1.       A steelmaking process that includes the steps of:
 (a)	producing molten steel and molten
 steelmaking slag in a steelmaking process in a steelmaking vessel, the steelmaking slag including iron units and flux units; and
 (b)	producing molten iron in a direct smelting
 process in a direct smelting vessel containing a molten
 bath of iron and slag using a substantial portion of the
 steelmaking slag as part of the feed material requirements
 for the direct smelting process.
 2.	The process defined in claim 1 wherein step (b>
 includes using at least 70% by weight of the steelmaking
 slag as part of the feed material requirements for the
 direct smelting process.
 3.	The process defined in claim 1 wherein step (b)
 includes using at least 80% by weight of the steelmaking
 alag as part of the feed material requirements for the
 direct smelting process.
 4.	The process defined in claim 1 wherein step (b)
 includes using at least 90% by weight of the steelmaking
 slag as part of the feed material requirements for the
 direct smelting process.
 5.	The process defined in any one of the preceding
 claims wherein step (b) includes using sufficient
 steelmaking slag to provide at least 50% by weight of the
 flux units of the feed material requirements of the direct
 smelting process.
 
 WO 2005/073412	PCT/AU2005/000112
 21
 6.	The process defined in any one of the preceding
 claims wherein the process is an integrated steelmaking
 process and includes producing molten iron in at laast one
 ironmaking vessel and supplying the molten iron as a
 ferrous feed material for step (a).
 7.	The process defined in any one of the preceding
 claims includes using iron produced in step (b) as at
 least part of the ferrous feed material for producing
 steel in step (a).
 8.	The process defined in any one of the preceding
 claims includes using iron produced in step (b) and in at
 least one other ironmaking vessel as the ferrous feed
 material for producing steel in step (a).
 9.	The process defined in any one of the preceding
 claims wherein step (b) includes controlling the direct
 smelting process to smelt the ferrous feed material and
 substantially partition phosphorus to the slag.
 10.	The process defined in any one of the preceding
 claims wherein the direct smelting process is a HIsmelt
 process.
 11.	The process defined in any one of the preceding
 claims Includes pre-treating ferrous feed material
 including steelmaking slag containing iron and flux units
 for step (b) by at least heating the ferrous feed material
 In a pre-treatment unit.
 12.	The process defined in claim 12 wherein the pre-
 treatment step includes preheating the ferrous feed
 material to at least 400°C.
 13.	The process defined in claim 12 wherein the pre-
 treatment step includes preheating the ferrous feed
 
 WO 2005/073412	PCT/AU2005/000112
 22 material to at least 700°C.
 14.	The process defined in any one of claims 11 to 13
 wherein the pre-treatment step includes preheating the
 ferrous feed material to a temperature less than 1050°C.
 15.	The process defined in any one of claims 11 to 13
 wherein the pre-treatment step includes preheating the
 ferrous feed material to a temperature less than 900°C.
 16.	The process defined in any one of claims 11 to 15
 wherein the pre-treatment step includes wet scrubbing an
 offgas produced in the step and using wet sludge
 containing steelmaking slag in the process.
 17.	The process defined in any one of the preceding
 claims wherein the direct smelting process includes using
 a slag forming agent to provide flux units for the process
 in addition to the flux units provide by the steelmaking
 slag.
 18.	The process defined in claim 17 wherein the
 direat smelting process includes injecting the slag
 forming agent directly into the direct smelting vessel as
 opposed to pretreating the slag forming, agent before
 injection into the vessel as is the case with the
 steelmaking slag.
 19.	The process defined in claim 18 wherein the
 amount of the slag forming agent injected directly into
 the direct smelting vessel is sufficient to provide up to
 30% by weight of the flux requirements.
 20.	The process defined in any one of claims 17 to 19
 wherein the additional slag forming agent includes calcium
 oxide.
 
 WO 2005/073412	PCT/AU2005/000112
 23
 21.	The process defined in any one of the preceding
 claims includes cooling the steelmaking slag produced in
 step (a) prior to using at least a portion of the
 steelmaking slag in step (b) .
 22.	The process defined in claim 21 further includes
 reducing the size of the cooled steelmaking slag prior to
 adding the steelmaking slag in step (b) .
 23.	A steelmaking plant for producing molten steel in
 accordance with the integrated steelmaking process defined
 in any one of the preceding claims that includes:
 
 (a)	a steelmaking apparatus for producing molten
 steel and molten steelmaking slag;
 (b)	an ironmaking apparatus for producing molten
 iron.
 24.	A direct smelting process for producing molten
 iron in a direct smelting vessel containing a molten bath
 of iron and slag, the process including the steps of:
 (a)	pre-treating ferrous feed material including
 steelmaking slag containing iron and flux units in a pre-
 treatment unit by at least heating the ferrous feed
 material; and
 (b)	direct smelting molten iron in a direct
 smelting vessel containing a molten bath of iron and slag
 using the pre-treated, ferrous feed material including
 steelmaking slag from step (a) as part of the feed
 material requirements for the direct smelting vessel.
 25.	The process defined in claim 24 wherein step (a)
 includes heating and at least partially reducing the
 ferrous feed material.
 
 WO 2005/073412	PCT/AU2005/000112
 24
 26.	The process defined in claim 24 or claim 25
 wherein step (a) includes heating the ferrous feed
 material to at least 400°C.
 27.	The process defined in claim 24 or claim 25
 wherein step (a) includes heating the ferrous feed,
 material to at least 700°C.
 28.	The process defined in any one of claims 24 to 27
 wherein step (a) includes preheating the ferrous feed
 material to a temperature less than 1050°C.
 29.	The process defined in any one of claims 24 to 27
 wherein step (a) includes preheating the ferrous feed
 material to a temperature less than 900°C.
 30.	The process defined in any one of claims 24 to 29
 wherein step (a) includes wet scrubbing an offgas produced
 in the step and using wet sludge containing steelmaking
 slag in the process.
 31.	The process defined in any one of claims 24 to 30
 wherein step (b) includes using a slag forming agent to
 provide flux units for the process in addition to the flux
 units provide by the steelmaking slag.
 32.	The process defined in claim 31 wherein step (b)
 includes injecting the slag forming agent directly into
 the direct smelting vessel as opposed to pretreating the
 slag forming agent before injection into the vessel as is
 the case with the steelmaking slag.
 33.	The process defined in claim 31 or claim 32
 wherein the amount of the slag forming agent injected
 directly into the direct smelting vessel is sufficient to
 provide up to 30% by weight of the flux requirements.
 
 PCT/AU2005/O00112 Received 30 November 2005
 25
 34.	The process defined in any one of claims 31 to 33
 wherein the additional slag forming agent [includes calcium
 oxide.
 35.	The procosa defined in any one of claims 24 to 34
 wherein step (b) includes controlling conditions within
 the direct smelting vessel to smelt the ferrous feed
 material to iron in the bath and to substantially
 partition phosphorus to the slag.
 36.	The process defined in any one of claims 24 to 35
 wherein step (b) includes controlling conditions within
 the direct smelting vessel to partition phosphorus to the
 slag by maintaining the slag in an oxidising condition
 whereby the partition ratio of phosphorus  in the iron to
 phosphorus in the slag is at least 1:5.
 
 37.	The prooess defined in any one of claims 24 to 36
 wherein step (b) includes controlling conditions within
 tho direct smelting vessel to partition phosphorus to the
 slag by maintaining the slag temperature to be in the
 range of 1350 - 1450 "C and the amount of FeO in the slag
 to be at least 3% by weight.
 38.	A steel making process that includes the steps
 of:
 (a)  producing moltan steel and molten
 steelmaking slag in a steelmaking process in a steelmaking vossel, the steeloaking alag including iron units and flux units; and
 (b)    producing molten iron in a direct smelting process in a direct smelting vessel containing a molten bath of iron and slag by supplying iron ore or pre-treated iron ore and carbonaceoun material to the direct smelting vessel as a part of the feed material requirements of the
 Amended Sheet FEA/AU
 
 PCT/AU2005/O00112 Received 30 November 2005
 26
 direct smelting process and using a substantial portion of the steclmaking slag from step (a) as another part of the feed material requirements for the direct smelting process and smelting the iron ore or pre-treated iron ore and iron units to produce molten iron.
 Amended Sheet IPEA/AU
 
 
 A steelmaking process is disclosed. The process includes producing molten steel and molten steelmaking slag in a steelmaking process, the steelmaking slag including iron units and flux units, and thereafter producing molten iron in a molten bath based direct smelting process using a substantial portion of the steelmaking slag as part of the feed material requirements for the direct smelting process. A direct smelting process is also disclosed. The process includes pre-treating ferrous material including steelmaking slag and thereafter direct smelting molten iron using the pretreated ferrous material as part of the feed material for the process.
 
 |